The Illuminating Company Solar
Updated November 2026
How rooftop solar works with The Illuminating Company (FirstEnergy / CEI): Cleveland-metro interconnection, Rider No. 17 Net Energy Metering, and how that differs from Cleveland Public Power.
Solar Brokers · Reynoldsburg · since 2013 · 4,000+ installs · A+ BBB
2013
Helping Ohio homeowners go solar
4000+
Solar installations completed
A+
Better Business Bureau rating
Who This Page Is For
Use this guide if your bill says The Illuminating Company (also known historically as Cleveland Electric Illuminating / CEI) — FirstEnergy’s Greater Cleveland operating company. The PUCO tariff territory covers distribution service in Ashtabula, Cuyahoga, Geauga, Lake, Lorain, Medina, Portage, Summit, and Trumbull Counties. Confirm the address on the PUCO map; parts of Cuyahoga County can also be Ohio Edison, and parts of the City of Cleveland are Cleveland Public Power.
City permits, neighborhoods, and the CPP vs Illuminating split are covered on solar in Cleveland, Ohio. Sibling FirstEnergy utilities: Ohio Edison solar and Toledo Edison solar.
Not Illuminating Company? See AEP Ohio solar, AES Ohio solar, Duke Energy Ohio solar, or Columbus Division of Power solar.
Illuminating Company vs Cleveland Public Power
The Illuminating Company is a PUCO-regulated investor-owned utility. Cleveland Public Power (CPP) is a separate municipal utility serving parts of the City of Cleveland with its own solar interconnection application. An Illuminating Company interconnection approval does not apply to a CPP meter, and the reverse is also true.
Read the utility name on the bill before you start paperwork. This page is only for Illuminating Company / FirstEnergy delivery customers.
Illuminating Company Interconnection
The Illuminating Company uses FirstEnergy’s shared Ohio Retail Interconnection portal with Ohio Edison and Toledo Edison. Typical residential designs follow Level 1: ≤ 25 kW, inverter-based, certified, with a posted $50 application fee. Level 2 and Level 3 fees and capacity bands are posted on the same page.
Required package pieces include the site plan, one-line diagram, application fee, later Level 1 Short Form Agreement, Net Energy Metering Rider application, and third-party inspection documentation. FirstEnergy notes that bi-directional meter installation can take several weeks after the Net Energy Metering Rider application is in place, and that excess-generation credits are not tracked until that meter is set.
Illuminating Company interconnection mail: Attn: CEI Interconnection, 6099 Angola Road, Holland, OH 43528. Technical email: CEI_interconnection@firstenergycorp.com. Meter and billing: customer service 1-800-589-3101. Statewide interconnection standards: OAC Chapter 4901:1-22.
Illuminating Company Rider No. 17 — Net Energy Metering
The Illuminating Company’s PUCO No. 13 book includes Rider No. 17 Net Energy Metering Rider (Original Sheet No. 93, effective October 27, 2009, still listed in the current tariff table of contents). Eligibility matches Ohio’s customer-generator definition: solar and other listed resources on the premises, parallel operation, primarily to offset the customer’s own use.
Billing mechanics match the FirstEnergy Ohio sibling riders: net delivered kWh are billed under the applicable rate schedule’s energy charges; net excess kWh in a billing period are credited using energy charges of the Generation Service Rider (GEN), accumulate as bill credits, and may be refunded on written request up to an annual twelve-month true-up.
FirstEnergy’s FAQ restates the consumer version: one-for-one offset up to energy delivered in the period; excess at the applicable generation component. We do not publish an Illuminating Company export ¢/kWh. FirstEnergy also states there is currently no company-sponsored rebate for customer-owned self-generation. Statewide rules: OAC 4901:1-10-28. Timing of other programs: Ohio solar incentives.
What Appears on an Illuminating Company Bill
Confirm the delivery company line reads The Illuminating Company (not Ohio Edison, CPP, AEP Ohio, or Duke). Note the residential rate schedule, competitive-supplier status if any, and twelve months of kWh history for sizing discussion under the statewide 120% historical-usage net-metering test.
Upload a statement for bill analysis. Panels overview: Ohio solar panels.
Options We Compare for Illuminating Company Customers
We compare Propel, cash, loan, and PPA for Illuminating Company homes. See solar financing in Ohio and solar batteries in Ohio.
IRC 25D is not available for property placed in service after December 31, 2025. We confirm current federal timing when we quote.
Illuminating Company (CEI) Solar: What Applies in 2026 (Updated November 2026)
The Illuminating Company, often called CEI, is the FirstEnergy Ohio utility for much of Northeast Ohio, including many Cleveland-area homes. Some Cleveland addresses are on Cleveland Public Power instead. Check the utility name on your bill before you rely on anything below.
How CEI net metering credits work
- CEI’s net metering terms are in Rider No. 17, Net Energy Metering, of its P.U.C.O. No. 11 tariff. The rider requires a written application. Illuminating Company tariff, Rider No. 17
- One meter measures flow in both directions. If the meter has to be modified or a new one installed, the customer pays for it. CEI Rider No. 17
- Net excess generation is credited at the Generation Service Rider (GEN) energy charges and carries forward as a bill credit. On written request, you can get a refund of accumulated credits, up to an annual 12-month true-up. CEI Rider No. 17
- Under state rules the system is sized not to exceed 120% of your requirements, there is no charge on exported electricity, and renewable energy credits stay with you. OAC 4901:1-10-28
CEI interconnection, step by step
- Gather 12 months of CEI bills and confirm the account is in your name.
- Your installer applies in FirstEnergy’s Ohio retail interconnection portal with a site plan and one-line diagram. Level 1 is for certified inverter-based systems up to 25 kW, and the application fee is $50. Level 2 is $50 plus $1 per kW. FirstEnergy Ohio Retail Interconnection
- Under state rules, the utility has 14 calendar days to confirm a Level 1 application is complete, then 21 calendar days to finish the Level 1 review. It must send the agreement within 10 days after approval. OAC 4901:1-22-04 · OAC 4901:1-22-06
- Your installer pulls local building and electrical permits for the house. Those are separate from utility approval.
- After installation, submit the signed agreement and the inspection results. FirstEnergy installs the net meter and issues approval to operate. Don’t turn the system on before that. FirstEnergy
Related Ohio guides: Ohio net metering · Ohio solar interconnection
Get a Free Quote or call (614) 439-9769
Illuminating Company Solar — FAQs
My Cleveland address — is it always The Illuminating Company?
No. Many Cleveland-metro homes are Illuminating Company, but City of Cleveland pockets may be Cleveland Public Power, and some Cuyahoga County areas may be Ohio Edison. The bill and PUCO map decide.
Is excess solar credited at the full stacked residential rate?
Not under Rider No. 17’s excess formula. Net excess uses Generation Service Rider (GEN) energy charges. Self-consumed solar still offsets usage at the house before it shows as export.
Which interconnection email do I use?
CEI_interconnection@firstenergycorp.com for The Illuminating Company — not the Ohio Edison or Toledo Edison inboxes.
Can I go solar with $0 down in Illuminating Company territory?
Yes. $0-down financing is one of the options Solar Brokers U.S. compares for Illuminating Company customers in Greater Cleveland, alongside cash, loan, PPA, and Propel. Terms depend on the program and approval, so we run each option against your actual Illuminating Company bill. Start with a solar quote or call (614) 439-9769.
Is the Illuminating Company the same as Cleveland Public Power?
No. They are separate utilities. CEI’s net metering terms come from its PUCO tariff (Rider No. 17). Use the utility name printed on your electric bill. Source: The Illuminating Company P.U.C.O. No. 11
How long does CEI interconnection review take?
State rules require the utility to confirm a Level 1 application is complete within 14 calendar days, and to finish the Level 1 review within 21 calendar days after that. Level 3 projects can take much longer. FirstEnergy says six months to a year. Source: Ohio Adm. Code 4901:1-22-04 · Ohio Adm. Code 4901:1-22-06 · FirstEnergy
Does CEI pay cash for excess solar?
Excess generation is a bill credit at GEN energy charges. You can ask in writing for a refund of accumulated credits, up to an annual 12-month true-up. Source: The Illuminating Company P.U.C.O. No. 11
Who owns the solar renewable energy credits?
Under Ohio’s net metering rule, renewable energy credits belong to the customer-generator. Source: Ohio Adm. Code 4901:1-10-28
Official Sources
- FirstEnergy Ohio Retail Interconnection (CEI contacts, Level 1 fees, portal)
- FirstEnergy Ohio interconnection FAQ
- The Illuminating Company P.U.C.O. No. 13 Schedule of Rates (territory; Rider No. 17 / Sheet 93)
- OH Net Energy Metering Rider – Application for Service
- OAC 4901:1-10-28
- OAC Chapter 4901:1-22
Updated November 2026.
Analyze Your Illuminating Company Bill
Send a recent bill and we will walk through Illuminating Company interconnection and Rider No. 17 against your usage. Call (614) 439-9769 and ask about $0-down solar financing.